Airport


Tuesday July 23. 2013

Multi-level Transportation Systems

Showalter Terminal – Site layout, grading for the site, a new stormwater management system was constructed to serve the facility, and pavement design was done for this project.

OC Fire Rescue – The project consists of the construction of a stormwater management system to serve the Orange County Fire Rescue Hangar at the Orlando Executive Airport. Modifications to the existing site include a new hangar, helipad and parking lot. The proposed stormwater management system to serve the added impervious area consists of two dry detention ponds with underdrain systems to drawdown the required treatment volume.

Airport Master Planning – Site layout, grading for the site, a new stormwater management system was constructed to serve the facility, and pavement design was done for this project